TDU Delivery Charges for Texas Business Accounts: How Oncor, CenterPoint, AEP Texas and TNMP Bill Commercial Rate Classes

Small business meters paid 1.29 to 5.38 cents per kWh in delivery on November 1, 2026, and above each utility's demand cutoff the charge moves to per kW. Here's how each TDU bills its commercial classes, which riders move and when, and what to check before you sign.

TDU delivery charges are the regulated fees a Texas transmission and distribution utility (TDU) bills for carrying electricity over its poles, wires and meters to your business. Your retail electric provider (REP) passes them through and can't set them or bill more than the tariff amount. As of November 1, 2026, the smallest commercial meters paid 1.29 to 5.38 cents per kWh in delivery plus $4.96 to $8.15 a month in fixed charges, depending on the TDU. Above each utility's demand cutoff, most commercial TDU delivery charges are billed per kW of demand instead.

This guide shows how Oncor, CenterPoint Energy Houston Electric, AEP Texas and Texas-New Mexico Power (TNMP) bill each commercial rate class, which riders move and when, and how to put delivery next to an energy-only quote. Every tariff figure comes from the monthly rate report each utility filed with the Public Utility Commission of Texas (PUCT) for November 1, 2026, checked against its tariff. Market figures come from the texascommercialplans.com dataset of published commercial offers we track. For the wider rate picture, start with our complete guide to commercial electricity rates in Texas.

Key takeaways

  • TDU delivery charges are set by PUCT-approved tariffs, and 16 TAC 25.479(g)(2) bars a REP from billing more than the TDU tariff charge.
  • Each TDU splits small business meters at a demand cutoff: 10 kW for Oncor and AEP Texas, 10 kVA for CenterPoint and 5 kW for TNMP. Below it you pay mainly per kWh. Above it you pay mainly per kW.
  • On November 1, 2026, small-class delivery ran 5.3843 cents per kWh in Oncor territory, 4.2983 cents in CenterPoint, about 4.4 cents in AEP Texas Central, about 4.3 cents in AEP Texas North and 1.2868 cents in TNMP.
  • Riders make up about 38 to 77 percent of those per-kWh charges, and each rider resets on its own legal calendar.
  • A fixed-rate small commercial plan can still change price for actual changes in TDU charges under 16 TAC 25.475(b)(5), so ask how each offer treats delivery before you sign.

What are TDU delivery charges, and why doesn't your REP set them?

TDU delivery charges are the utility's price for delivering power to your meter, not the price of the power itself. In the competitive part of ERCOT, the REP you choose sells the energy, while the TDU that owns the wires in your area delivers it and bills the REP under a tariff the PUCT approves. The REP then bills you, so the delivery charge is the same whichever REP you pick.

The REP can't add a margin to it. The PUCT's billing rule says that for TDU charges, a list that includes delivery charges and tariff riders, "the amount billed by the REP must not exceed the amount of the TDU tariff charge(s)" (16 TAC 25.479(g)(2)). A REP may show delivery on its own lines, fold it into one all-in price, or quote energy only and add delivery at cost. The tariff charge underneath doesn't change.

Five investor-owned TDU rate zones cover most of the competitive commercial market: Oncor (Dallas-Fort Worth, North and West Texas), CenterPoint Energy (Greater Houston and the Gulf Coast), AEP Texas Central (Corpus Christi, the Coastal Bend and South Texas), AEP Texas North (Abilene, San Angelo and the Big Country) and TNMP (communities in North Central Texas, around Houston, along the Gulf Coast and in West Texas). AEP Texas Central and AEP Texas North are two rate zones of one company, AEP Texas, so four utilities file the five sets of charges.

Which commercial rate class is your meter in?

Your rate class depends on your meter's peak demand and your TDU's cutoff. A non-residential meter at secondary voltage that peaks at or below 10 kW in Oncor or AEP Texas territory, 10 kVA in CenterPoint territory or 5 kW in TNMP territory is billed mainly per kWh. Above the cutoff it moves to a demand class billed mainly per kW, or per kVA in CenterPoint territory.

Secondary voltage commercial rate classes by TDU, tariffs in effect November 2026
TDUSmall classSmall class billed mainly onDemand classDemand class billed mainly on
OncorSecondary, 10 kW or lesskWhSecondary, above 10 kWBilling kW, plus NCP kW or 4CP kW
CenterPoint EnergySecondary, 10 kVA or lesskWhSecondary, above 10 kVABilling kVA, plus NCP kVA or 4CP kVA
AEP Texas Central and NorthSecondary, 10 kW or lesskWhSecondary, above 10 kWBilling kW, plus NCP kW or 4CP kW
TNMPSecondary, 5 kW or lesskWhSecondary, above 5 kWBilling kW, plus NCP kW or 4CP kW

Three details decide which side of the line a business lands on. The first is the lookback. CenterPoint's small class requires demand at or below 10 kVA in the current month and in each of the previous 11 months, and AEP Texas moves a premises that peaks above 10 kW to its larger class for at least 12 months, so a single hot July can set your class for a year. The second is the unit. CenterPoint measures kVA, which equals kW only at a perfect power factor, so a 9.5 kW peak at a 0.9 power factor reads about 10.6 kVA and crosses the line. The third is TNMP's lower cutoff. A shop using 1,500 kWh a month at the 30 percent load factor the PUCT uses for small commercial Electricity Facts Labels peaks near 6.85 kW, which keeps it in the small class everywhere except TNMP territory.

Don't confuse the TDU rate class with the PUCT's definition of a small commercial customer. That definition covers a non-residential customer with peak demand under 50 kW (16 TAC 25.471) and decides your retail protections, such as the Electricity Facts Label. A 30 kW restaurant is a small commercial customer for its EFL and a demand-class meter for its delivery charges.

How does each TDU bill its smallest commercial class?

Each TDU bills its smallest commercial class a fixed monthly customer charge and metering charge plus one per-kWh delivery rate that bundles base rates and riders. On November 1, 2026, that per-kWh rate ran from 1.2868 cents in TNMP territory to 5.3843 cents in Oncor territory, and the fixed charges from $4.96 to $8.15 a month.

Small commercial TDU delivery charges, rates in effect November 1, 2026
TDURate classAs ofCustomer charge (per month)Metering charge (per month)Delivery (cents/kWh)Delivery on 1,000 kWh
OncorSecondary, 10 kW or lessNov 1, 2026$2.34$4.365.3843$60.54
CenterPoint EnergySecondary, 10 kVA or lessNov 1, 2026$2.01$2.954.2983$47.94
AEP Texas CentralSecondary, 10 kW or lessNov 1, 2026$1.45$4.214.4 (rounded)$49.66
AEP Texas NorthSecondary, 10 kW or lessNov 1, 2026$1.45$4.214.3 (rounded)$48.66
TNMPSecondary, 5 kW or lessNov 1, 2026$1.75$6.401.2868$21.02

Sources: the November 1, 2026 rate reports filed in PUCT Project 58511 by Oncor, CenterPoint, TNMP and AEP Texas. AEP Texas reports its small-class rate rounded to a tenth of a cent and notes that its figures leave out charges set as a percentage of revenue.

How much of the per-kWh charge is base rate, and how much is riders?

Riders make up roughly 38 to 77 percent of the small-class per-kWh delivery charge, depending on the TDU. The base distribution charge changes only in a rate case, while each rider resets on its own schedule, so the rider share is the part of delivery most likely to move during your contract.

What makes up the small-class per-kWh delivery charge, cents per kWh, rates in effect November 1, 2026
TDUAs ofBase distributionRider TCRFRider DCRFOther riders and creditsTotalRider share
OncorNov 1, 20263.12361.33820.62080.30175.384342%
CenterPoint EnergyNov 1, 20261.78931.15060.54900.80944.298358%
AEP Texas CentralNov 1, 20262.64540.92980.5594about 0.27about 4.4about 40%
AEP Texas NorthNov 1, 20262.64540.92980.5594about 0.17about 4.3about 38%
TNMPNov 1, 20260.29800.72860.00000.26021.286877%

The other riders differ by utility. In Oncor territory they are mainly Rider IS, an interim surcharge of 0.2878 cents per kWh scheduled to run through December 2026, plus small rate case expense and energy efficiency (EECRF) charges. In CenterPoint territory they are mainly the EECRF and system restoration charges, net of credits, and together they add more than its DCRF does. In TNMP territory they are the EECRF, Rider HCRF and a rate case expense rider. TNMP's base distribution charge for this class is only 0.2980 cents under the base rates that took effect September 13, 2026, so its transmission rider is the largest line in the total. The AEP Texas figures are approximate because AEP Texas rounds its reported totals.

How are demand-billed commercial accounts charged?

Above the cutoff, a commercial account pays most of its delivery per kW of demand: a distribution-side charge on billing kW, a transmission charge on NCP kW or 4CP kW, a larger fixed monthly charge and a small per-kWh charge. The kWh you use barely moves this part of the bill. Your peak demand does.

Demand-billed secondary service above each TDU's cutoff, rates in effect November 1, 2026
TDUApplies aboveAs ofDistribution side, per billing kWTransmission, per NCP kWTransmission, per 4CP kWPer kWhFixed charges (per month)
Oncor10 kWNov 1, 2026$9.014603$4.606104$6.536625$0.000546$44.99
CenterPoint Energy10 kVANov 1, 2026$6.473180 per kVA$4.342591 per kVA$6.177655 per kVA$0.000930$13.41 non-IDR, $151.41 IDR
AEP Texas Central10 kWNov 1, 2026$8.387185$4.139791$6.232736$0.000743$22.00
AEP Texas North10 kWNov 1, 2026$8.056107$4.139791$6.232736$0.000743$22.00
TNMP5 kWNov 1, 2026$9.262411 (annual load factor above 25%)$6.065473$8.305264$0.001561$17.66

Sources: the same November 1, 2026 PUCT Project 58511 reports, with each TDU's tariff for the billing units. Oncor's report combines its non-interval (non-IDR) charges into one $13.620707 per billing kW, which is the distribution-side charge plus the NCP transmission charge. TNMP bills $9.522580 per kW on the distribution side when annual load factor is 25 percent or less, and adds two small riders billed per kW worth about 23 cents per kW combined.

A worked example shows why peak matters more than usage. Take a non-IDR Oncor account with a 40 kW peak and an annual load factor above 25 percent. At 8,000 kWh in a month, its delivery comes to $594.18: $360.58 on the distribution side, $184.24 of transmission, $4.37 per kWh and $44.99 fixed. That's 7.43 cents per kWh. If the same account uses 12,000 kWh against the same 40 kW peak, delivery rises only $2.18, to $596.36, or 4.97 cents per kWh. Spreading load across more hours is the lever, because the demand charges don't care how many kWh sit under the peak.

What's the difference between billing kW, NCP kW and 4CP kW?

NCP kW is your meter's highest 15-minute demand in the billing month. Billing kW is the demand a distribution charge is actually applied to, and it can sit above this month's NCP because of a ratchet. 4CP kW is your average demand during ERCOT's four summer system peaks in the prior year, and it sets transmission charges only for large accounts.

  • NCP kW: the non-coincident peak, measured at your meter whenever your own demand peaks, whatever the grid is doing. Most demand-billed secondary accounts pay transmission charges on it.
  • Billing kW and the 80 percent ratchet: Oncor and TNMP generally bill distribution charges on the higher of this month's NCP or 80 percent of the highest monthly NCP in the previous 11 months. Oncor applies it to premises that have peaked above 20 kW, with a load factor exception. TNMP exempts three groups: premises whose peak stayed at or below 20 kW over the latest 12 months, premises with an annual load factor of 25 percent or less, and seasonal agricultural and municipal pumping accounts. CenterPoint bills its secondary class above 10 kVA on the current month's NCP kVA, with no ratchet. AEP Texas bills distribution on NCP and applies the 80 percent ratchet to a few riders.
  • 4CP kW: the average of your 15-minute demand at ERCOT's monthly system peak in June, July, August and September of the previous year. Oncor, AEP Texas and TNMP switch transmission billing to 4CP once a premises has set an NCP of at least 700 kW in a prior billing month, and CenterPoint uses 700 kVA. ERCOT publishes the four coincident peak intervals each year.

The ratchet is where small demand accounts get surprised. Picture an Oncor non-IDR account that peaked at 60 kW in July 2026 and peaks at 40 kW in November. November's distribution-side charges are billed on 48 kW, 80 percent of the July peak, while its transmission charge stays on the 40 kW NCP. At the November 1 rates, those 8 extra kW cost $72.12 a month, and they keep costing it until the July peak drops out of the 11-month window next summer.

Which delivery riders change, and when?

Four kinds of riders move TDU delivery charges between rate cases: the TCRF for transmission costs, the DCRF for distribution investment, the EECRF for energy efficiency programs, and one-off surcharges such as Oncor's Rider IS. Each has its own legal calendar, and a utility that elects the unified tracker under PURA Section 36.216 moves its DCRF and TCRF together in one annual case.

When Texas TDU delivery riders can change, rules in effect November 2026
RiderWhat it recoversWhen it can changeRule
Rider TCRFChanges in wholesale transmission cost since the last rate caseMarch 1 and September 1, on requests filed by December 1 and June 116 TAC 25.193
Rider DCRFDistribution investment added since the last rate caseOnce a year, September 1 by default, on requests filed April 1 to 816 TAC 25.243
Unified trackerDCRF, TCRF and wholesale transmission updates in one annual caseDecision due by day 120; if none, temporary rates from day 165 after 45 days' notice to REPs, subject to refund with interestPURA 36.216
Rider EECRFUtility energy efficiency program costsMarch 1, on requests filed by June 1 of the prior year16 TAC 25.182
Interim and special ridersCase-specific costs, such as Oncor's Rider IS or securitized storm costsAs each order setsThe order that created them
Base ratesEverything else in deliveryOnly in a base rate caseThe rate case order

A base rate case resets the riders. When new base rates take effect, the DCRF drops to zero because the investment it was recovering moves into base rates. Oncor's DCRF went to $0.000000 for every class on June 1, 2026, when base rates from Docket 58306 took effect, and TNMP's did the same on September 13, 2026, after Docket 58964. A new DCRF then recovers only investment added after that baseline.

A new rider rate replaces the old one. It's never added on top of it. When Oncor's unified tracker rates took effect on a temporary basis for bills rendered on and after October 4, 2026 (Docket 59249), its small-class TCRF of 1.3382 cents per kWh replaced the 1.6974 cents in effect since August 1, while its DCRF came back from zero at 0.6208 cents. The net change was 0.2616 cents per kWh, not the sum of both new rates. AEP Texas was the first utility to use the unified tracker, in Docket 58315, and its final factors took effect September 29, 2026, according to its tariff.

What delivery changes are already on the calendar?

Five dated items could move commercial delivery charges over the next year, and only one of them is a decrease that's already scheduled.

  • Oncor's Rider IS, 0.2878 cents per kWh on the small class and $0.997891 per billing kW above 10 kW, is scheduled to run through December 2026. If nothing else changes, Oncor's small-class charge falls by that amount when it ends.
  • Oncor's October 4 unified tracker rates are temporary. If the final order in Docket 59249 sets them lower, PURA 36.216(i) requires Oncor to refund or credit the difference with interest. Our report on Oncor's October 4 delivery charge change has the class-by-class rates.
  • TNMP asked the PUCT in Docket 59944 to start its unified tracker riders on February 13, 2027. As filed, the 5 kW or less class would pay 1.5685 cents per kWh more across the DCRF and TCRF, taking 1.2868 cents to about 2.86 cents. That's a request, not an approved rate. Our TNMP Rider DCRF report runs the per-kW math by class.
  • The default TCRF update dates under 16 TAC 25.193 fall on March 1 and September 1, 2027, and new EECRF rates take effect March 1, 2027. Our report on how CenterPoint's $4 billion plan reaches the TCRF statewide explains why a Houston transmission build can show up on bills in other territories.
  • New PUCT rule 16 TAC 25.58 lets TDUs contract for up to 100 MW of battery storage combined, with approved costs recovered through delivery charges. Nothing reaches a bill until the PUCT approves a specific contract, as our report on the November 4 storage rule explains.

CenterPoint's last change has already landed. Its DCRF increase from Docket 59981 applies to meters read on and after September 30, 2026, and the PUCT approved it as final on November 5, 2026 at the same rates. Our CenterPoint DCRF report shows the increase by class.

How does delivery sit beside the energy charge in an all-in comparison?

Most published commercial offers quote the energy charge only and add delivery at cost, so you have to add your TDU's delivery charges at your own usage and demand before two quotes are comparable. For a small account using 1,500 kWh a month, delivery is 23 to 57 percent of the pre-tax bill, depending on the TDU and the rate class the meter falls in.

Energy-only quotes are the norm: 91.9 percent of the active small commercial rows in our dataset were quoted that way on November 10, 2026, the latest date we've counted that split. The table pairs each territory's median published rate across the commercial offers we tracked on November 18, 2026 with the November 1 delivery charges above. The medians were 6.22 cents per kWh in Oncor territory (3,383 offers), 6.41 cents in CenterPoint (3,191), 6.40 cents in AEP Texas Central (3,170), 6.35 cents in AEP Texas North (2,914) and 6.30 cents in TNMP (2,888).

All-in cost of a 1,500 kWh small commercial account before taxes: energy at the November 18, 2026 territory median, delivery at November 1, 2026 rates
TDU and peak demandRate classEnergy priced as ofEnergy at medianTDU delivery (Nov 1, 2026 rates)Total before taxAll-in (cents/kWh)Delivery share
Oncor, 6.85 kW10 kW or lessNov 18, 2026$93.30$87.46$180.7612.0548%
CenterPoint Energy, 6.85 kW (about 7.6 kVA)10 kVA or lessNov 18, 2026$96.15$69.43$165.5811.0442%
AEP Texas Central, 6.85 kW10 kW or lessNov 18, 2026$96.00$71.66$167.6611.1843%
AEP Texas North, 6.85 kW10 kW or lessNov 18, 2026$95.25$70.16$165.4111.0342%
TNMP, 6.85 kWAbove 5 kWNov 18, 2026$94.50$126.55$221.0514.7457%
TNMP, 4.5 kW5 kW or lessNov 18, 2026$94.50$27.45$121.958.1323%

The two TNMP rows are the cutoff in dollars. The same 1,500 kWh costs $27.45 in delivery on a meter that peaks at 4.5 kW and $126.55 on one that peaks at 6.85 kW, about 4.6 times as much. The demand row rests on three assumptions. TNMP bills the account on its 6.85 kW NCP with no ratchet, which its tariff allows for premises that stayed at or below 20 kW over the latest 12 months. The account's annual load factor is above 25 percent. Its meter is non-IDR. On that basis the delivery breaks down as $63.45 on the distribution side, $41.55 of transmission, $17.66 fixed and $3.89 of smaller riders. The CenterPoint row assumes a 0.9 power factor. None of the rows includes a REP base charge, sales tax or a gross receipts reimbursement, and our guide to whether TDU delivery charges are taxable covers the tax on top.

Does a fixed-rate plan lock in delivery charges?

Not necessarily. For residential and small commercial customers, 16 TAC 25.475(b)(5) lets a fixed-rate product's price change "solely to reflect actual changes in TDU charges," along with changes in ERCOT or Texas Regional Entity administrative fees and qualifying new legal costs (16 TAC 25.475). A fixed small commercial plan can pass a delivery rider change through to you.

Offers handle delivery in one of three ways. A pass-through offer fixes the energy rate and bills delivery at the tariff amount each month, so every rider change flows straight to your bill. An included, adjustable offer quotes one all-in price that moves when TDU charges move. An included, held offer keeps one all-in price for the term, which shifts the delivery risk to the REP, and that risk is usually priced in. The Electricity Facts Label tells you which one you have: under 25.475(g) it must answer "Can my price change during contract period?" and say how and by how much. Our guide to reading a commercial electricity facts label walks through that line. Accounts at 50 kW and above fall outside the small commercial EFL rules, so for them the contract's TDU clause is the only answer.

The TxCP Delivery Charge Check

The TxCP Delivery Charge Check is five questions to answer before you sign a commercial electricity contract, one for each way delivery changes what you actually pay. Run it on a recent bill for each meter you pay for, using the November 1, 2026 figures above or the latest PUCT report.

  1. Class: Which rate class is the meter billed on, and has its peak crossed the cutoff (10 kW, 10 kVA or 5 kW) at any point in the last 12 months?
  2. Unit: Is delivery billed per kWh, per billing kW, per NCP kW or per 4CP kW, and is a ratchet setting billing kW above this month's peak?
  3. Treatment: Does the offer pass delivery through at cost, include it in an adjustable price or hold it fixed, and what does the EFL say under "Can my price change"?
  4. Calendar: Which riders reset during the term, such as the TCRF on March 1 and September 1, the EECRF on March 1, a unified tracker date for your TDU or a surcharge that ends?
  5. Math: Have you added your own delivery, at your usage and your peak, to every energy-only quote before ranking them?

Question five is where most comparisons go wrong. Our commercial rate comparison worksheet lines up energy, delivery and fixed charges so every quote lands on the same all-in basis.

Where can you check current TDU delivery charges yourself?

The PUCT's TDU rates page links the monthly rate report each utility files in Project 58511 for rates in effect on the first of each month, and each TDU publishes its full tariff. Those two sources are where every tariff figure in this guide comes from, and the monthly report is the faster one to read.

When a report changes, check three things: the effective date printed beside each rider, whether the rate is temporary or final, and the billing unit, since a per-kW change and a per-kWh change hit accounts differently. Our coverage of recent changes includes Oncor's October 4 unified tracker, CenterPoint's September 30 DCRF increase and TNMP's February 13, 2027 request, all linked above. For how delivery shapes local pricing, see our guide to commercial electricity rates in Houston, and for how the market median has moved, the Texas electricity rates chart.

To line delivery up against every published commercial offer in your territory, browse current rates on our rates by territory pages or get every plan we track in the full dataset download.

Frequently Asked Questions

What are TDU delivery charges on a commercial electric bill?

They are the regulated charges your transmission and distribution utility bills for delivering electricity to your business: a fixed customer and metering charge plus a per-kWh or per-kW delivery rate and its riders. Your REP passes them through at the tariff amount. On November 1, 2026, small business meters paid 1.29 to 5.38 cents per kWh, depending on the TDU.

Who has the lowest TDU delivery charges for a small business?

Per kWh, TNMP's Secondary Service at 5 kW or less was lowest on November 1, 2026, at 1.2868 cents plus $8.15 a month. TNMP's cutoff is 5 kW, though, so many small businesses there pay its demand rates instead. Among the 10 kW and 10 kVA classes, CenterPoint at 4.2983 cents and AEP Texas North at about 4.3 cents (AEP reports its figure rounded) were lowest per kWh, and CenterPoint had the lowest fixed charges at $4.96 a month.

Can my REP mark up TDU delivery charges?

No. Under 16 TAC 25.479(g)(2), the amount a REP bills for TDU charges, including delivery charges and tariff riders, must not exceed the TDU tariff charge. A REP can bundle delivery into an all-in price, but the tariff amount underneath is the same for every REP.

Can delivery charges change during a fixed-rate contract?

Yes, for a small commercial fixed-rate product that passes them through. 16 TAC 25.475(b)(5) lets a fixed-rate price change solely to reflect actual changes in TDU charges, among a few other listed costs. Check the EFL line "Can my price change during contract period?" and the contract's TDU terms.

Why is my business billed per kW instead of per kWh?

Your meter's peak demand is above your TDU's cutoff: 10 kW for Oncor and AEP Texas, 10 kVA for CenterPoint or 5 kW for TNMP. Above it, most delivery is billed per kW of demand, so your peak sets the charge more than your usage does. CenterPoint and AEP Texas also look back over prior months when they class a meter.

What is 4CP, and does it apply to my business?

4CP is your average 15-minute demand during ERCOT's monthly system peaks in June through September of the previous year. Texas TDUs use it to bill transmission only once a premises has set a peak of at least 700 kW, or 700 kVA for CenterPoint, so most small and mid-size businesses are billed on their own monthly peak instead.

See published commercial rates on the territory pages, or get every plan in the full dataset.